Project Timeline_P3/A-420: SP’12

Posted by: Ping

Project Timeline: 3/13 ~ 4/12 (4 weeks)
3/15: Study company websites, prepare the research paper, and check the sketches
3/20: Review the research paper draft and make a grid decision for <div> arrangement
3/22: Prepare the project brief (draft), sitemap draft, and complete the graphic design in AI
3/27: Complete the Craftmaster site homework and home page in Dreamweaver with CSS
3/29: Review all first level pages (CSS review / layout review)
4/03: Validate CSS and HTML, then complete all first level pages
4/05: Review all second level pages (CSS review / layout review)
4/10: Validate CSS and HTML for every page, then finalize the website
4/12: Present the website through your URL and finish the online critique
• Turn in all digital files in a CD with a project book pdf file (don’t print and don’t bind)
• Present 3 first level pages (mount them on 20X30 black foamcore)
• Present 3 second level pages (mount them on 20X30 black foamcore)